Based on Official Syllabus Topics of Actual SAP C-TS422-2022 Exam [Q19-Q43]

Rate this post

Based on Official Syllabus Topics of Actual SAP C-TS422-2022 Exam

Free C-TS422-2022 Dumps are Available for Instant Access

QUESTION 19
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements?
Note: There are 2 correct answers to this question

 
 
 
 

QUESTION 20
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 21
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

 
 
 
 

QUESTION 22
Which time elements are relevant for lead time scheduling of a production order? Note:
There are 2 correct answers to this question.

 
 
 
 

QUESTION 23
Your project team decided to use a make-to-order planning strategy material in discrete manufacturing.
what is the impact of this decision?
Note: there are 2 correct answers to this question

 
 
 
 
 

QUESTION 24
What are the options if the Dispatched operation status is set for a production order operation?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 25
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?

 
 
 
 

QUESTION 26
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 27
In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.

 
 
 
 
 

QUESTION 28
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

 
 
 
 

QUESTION 29
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question

 
 
 
 

QUESTION 30
You are trying to create a production order and NO valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 31
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

 
 
 
 
 

QUESTION 32
You Have a scheduling agreement with a vendor, you want classic MRP to automatically create schedule lines in case of material shortage, what must you do?
Note: there are 2 correct answers to this question.

 
 
 
 

QUESTION 33
Which information is required when you create a product master in SAP S/4HANA?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 34
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Note: There are 2 correct answers to this question

 
 
 
 

QUESTION 35
During production order creation, several valid production versions are found. How does the system choose the production version?

 
 
 
 

QUESTION 36
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 37
In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.

 
 
 
 
 

QUESTION 38
How would you define pegging in the context of Advanced Planning?

 
 
 
 

QUESTION 39
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question

 
 
 
 

QUESTION 40
Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.

 
 
 
 
 

QUESTION 41
where does the system check master data selection settings during the creation of planned orders and production orders?
Note: There are 3 Correct answers to this question.

 
 
 
 
 

QUESTION 42
What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching?
Note: There are 2 correct answers to this question.

 
 
 
 

QUESTION 43
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

 
 
 
 
 

SAP C-TS422-2022 Exam Syllabus Topics:

Topic Details
Topic 1
  • Capacity Planning in SAP S
  • 4HANA: This section deals with the best practices related to SAP S
  • 4HANA and explains SAP HANA database principles. It deals with the understanding of the new user experience with SAP Fiori.
Topic 2
  • Process Orders in SAP S
  • 4HANA: This section covers process order elements and process order processing. It concerns the understanding of master data objects and identifying features for Good Manufacturing Practices.
Topic 3
  • Demand Management in SAP S
  • 4HANA: This section explains and compare various production techniques in make-to-order, assembly strategizing, and make-to-stock.
Topic 4
  • Advanced Planning in SAP S
  • 4HANA: This section covers the basics and master data of advanced planning and explains tools and advanced planning.
Topic 5
  • Material Requirements Planning in SAP S
  • 4HANA: This section covers choosing and implementing planning strategies and using the planning table to ensure long-term planning. This covers mastering production scheduling and explaining MRP basics as well as lot size processes.
Topic 6
  • Master Data in SAP S
  • 4HANA: This section of the exam covers describing and pinpointing production-relevant master data such as bill of material, routing, and production version.
Topic 7
  • Introduction to SAP S
  • 4HANA Production Planning: This section covers production planning components and how to distinguish consumption-focused planning vs. MRP.
Topic 8
  • Production Orders in SAP S
  • 4HANA: This section covers determining the BOM item category, describing the status management, and setting user statuses. It also covers topics such as setting up availability checks for components and trigger routing selection.
Topic 9
  • Lean Manufacturing in SAP S
  • 4HANA: This section identifies repetitive manufacturing-specific master data and describes line load planning. It also covers describing Kanban master data and Kanban processes.

 