Pass Your C-TS422-2601 Dumps as PDF Updated on 2026 With 100 Questions [Q26-Q44]

Rate this post

Pass Your C-TS422-2601 Dumps as PDF Updated on 2026 With 100 Questions

SAP C-TS422-2601 Real Exam Questions and Answers FREE

SAP C-TS422-2601 Exam Syllabus Topics:

Section Weight Objectives
Topic 1: Process Orders < 8% – Master Data for Process Manufacturing
– Process Order Management
Topic 2: Production Orders 12% – 18% – Order Settlement and Closing
– Availability Check and Capacity Check
– Order Creation and Structure
– Order Release and Execution
Topic 3: Lean Manufacturing and Kanban 8% – 12% – Kanban Process and Setup
– Repetitive Manufacturing
Topic 4: Integration and Analytics 10% – 15% – Integration with Finance / Controlling
– Manufacturing Reporting and Analytics
Topic 5: Advanced Planning (PP/DS) 8% – 12% – Pegging and Alerts
– Heuristics and Planning Functions
Topic 6: Material Requirements Planning (MRP) 8% – 12% – Procurement Proposals
– MRP Logic and Planning Run
– MRP Types and Parameters
Topic 7: Capacity Planning 8% – 12% – Capacity Evaluation
– Capacity Leveling and Scheduling
– Finite Scheduling Concepts
Topic 8: Master Data in SAP S/4HANA 12% – 18% – Work Centers and Routings
– Material Master Data
– Production Versions
– Bill of Materials (BOM)
Topic 9: Demand Management < 8% – Planned Independent Requirements
– Demand Strategies

 

NO.26 In your plant MRP is activated.
Which options do you have to exclude a material from the MRP run?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.27 How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer.

 
 
 
 

NO.28 For a production version to be valid consistent what requirements must be fulfilled?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.29 Where does the system check master data selection settings during the creation of planned orders production orders?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.30 How can you achieve a feasible production plan in case of capacity constraints?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.31 In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning.
What does this mean for the capacity requirements of a new order?

 
 
 
 

NO.32 What determines whether the planned independent requirements in dem management are consumed by other requirements?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.33 Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

 
 
 
 

NO.34 You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?

 
 
 
 

NO.35 Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.36 What will happen in the MRP run if you have created a new MRPrelevant material that supports both inhouse production external procurement?

 
 
 
 

NO.37 Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.38 How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition?
Note: There are 3 correct answers to this question.

 
 
 
 
 

NO.39 Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.40 In the context of the capacity scheduling table, how do you define a pacemaker work center?

 
 
 
 

NO.41 Which of the following would you recommend as SAP’s strategic Sales and Operations planning tool?

 
 
 
 

NO.42 Your project uses process orders for the production of liquid chemicals.
What can you define to ensure that production flow only happens in suitable physically connected tanks?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.43 Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

 
 
 
 

NO.44 You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past.
How can you parameterize this in the strategy profile?

 
 
 
 

Pass SAP C-TS422-2601 Exam Info and Free Practice Test: https://www.it-tests.com/C-TS422-2601.html

         