Q107. Prior to the beginning work on Activity 6001, the scope is changed by executed change order to increase the activity duration by thirty days and rock fill by 100.000 cubic meters If the project has progressed as scheduled up to the point of the executed change order, what activities would be changed on the next project update?

 
 
 
 

Q108. What portion of Activity B is on the critical path?

 
 
 
 

Q109. Constraints control events or activities that __________________.

 
 
 
 

Q110. In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):

 
 
 
 

Q111. Determine the correct formula and date for the late start for the Activity 11001:

 
 
 
 

Q112. Which of the following types of delay will NOT result in a time extension and additional compensation for a contractor?

 
 
 
 

Q113. Determine the correct formula and date for the late finish for Activity 9004.

 
 
 
 

Q114. Theoretically construct a summary activity for activities 2001 through 2004. Using the “normal” schedule, what is the cost of the hammock?

 
 
 
 

Q115. During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?

 
 
 
 

Q116. Crane operators require 1 hour prep and 1 hour clean-up and inspection per day. There is only 1 crane operator allocated per crane. Crane operators are not allowed to work more than 8 hours a day. Lunchtime break lasts 1 hour. Assuming a 10 minute cycle time, how many lifts per day can be expected?

 
 
 
 

Q117. At a minimum, periodic reporting must be done at what interval?

 
 
 
 

Q118. What is the relationship depicted between Activity G and Activity H?

 
 
 
 

Q119. If a detailed estimate is NOT available to assist in the formulation of activity durations but unit quantities have been identified, what information can be utilized to estimate work package/activity durations?

 
 
 
 

Q120. The Work Breakdown Structure (WBS) is established to reflect the:

 
 
 
 

Q121. What is the relationship depicted between Activity G and Activity H?

 
 
 
 

Q122. The Scope of Work divides the major deliverables into smaller more manageable components for all of the following EXCEPT to:

 
 
 
 

Q123. Baseline schedule can be submitted only__________.

 
 
 
 

Q124. Which of the following is NOT required when initially planning a project?

 
 
 
 

Q125. In a “crashed” schedule, which is a chain of activities that precede activity 2004?

 
 
 
 

AACE International AACE-PSP (Planning and Scheduling Professional) Certification is a globally-renowned credential designed for professionals involved in project planning and scheduling. Planning & Scheduling Professional (PSP) Exam certification is recognized across a variety of industries, including construction, engineering, and energy, among others. AACE International is a non-profit professional organization with over 9,000 members worldwide, who are dedicated to the practice of cost engineering, project management, and related professions. The AACE-PSP certification program equips professionals with the skills and knowledge necessary to excel in project planning and scheduling, as well as to become a valuable asset to their organizations.

 