[Q83-Q107] PSPO-I by Scrum Actual Free Exam Questions And Answers [UPDATED 2022]

Rate this post

PSPO-I by Scrum Actual Free Exam Questions And Answers [UPDATED 2022]

PSPO-I Questions Truly Valid For Your Scrum Exam!

NO.83 Sprints are fixed length events of one month or less to create consistency.

 
 

NO.84 If the Definition of Done for an increment is part of the standards of the organization, all Scrum Teams must follow it as a minimum.

 
 

NO.85 Developers in a Scrum Team are responsible for instilling quality by adhering to a Definition of Done.

 
 

NO.86 Which of the following are Scrum Values?

 
 
 
 
 
 
 
 

NO.87 Following Scrum, there can be a maximum of one release per Sprint.

 
 

NO.88 The Sprint length can be 4 weeks.

 
 

NO.89 The Product Owner is basically a Project Manager 2.0.

 
 

NO.90 Which of the following is correct about the Product Vision?

 
 
 

NO.91 Which two of the following contribute the most to the Scrum Value “Focus”?

 
 
 
 

NO.92 Which Scrum Event can be compared to the use of a “lessons learned meeting”?

 
 
 
 

NO.93 What can be used by the Product Owner to identify unfinished work at the end of the Sprint.

 
 
 
 

NO.94 Adding a new member to the Developers may cause a short-term decrease in your teams productivity.

 
 

NO.95 The Definition of Done shouldn’t be changed in the middle of the Sprint.

 
 

NO.96 The Scrum Master is accountable for maximizing the value of the product resulting from the work of the Scrum Team.

 
 

NO.97 In the Sprint Review, only the Developers, the Scrum Master and the Product Owner are allowed.

 
 

NO.98 When n Scrum teams are working on a product, there should always be only 1 Product Owner but 1-n Scrum Masters.

 
 

NO.99 Which Scrum accountability (role = outdated term) is owning the Product Backlog?

 
 
 

NO.100 Is it allowed to have other meetings besides the Scrum events?

 
 

NO.101 Which of the following is a typical output of a Sprint?

 
 
 

NO.102 It is mandatory in Scrum to release a Product Increment at the end of each Sprint.

 
 

NO.103 What happens with “Done” Sprint Backlog items when a Sprint was cancelled?

 
 
 

NO.104 Which of the following actions may a Scrum Master take in starting up a project?

 
 
 
 

NO.105 The Sprint Retrospective meeting is a time boxed Scrum event.

 
 

NO.106 The purpose of the Daily Scrum is to inspect progress toward the Sprint Goal and adapt the Sprint Backlog as necessary, adjusting the upcoming planned work.

 
 

NO.107 The Sprint Review is a working session.

 
 

Get instant access of 100% real exam questions with verified answers: https://www.it-tests.com/PSPO-I.html

         

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw